Fields / 25/7-4 S
25/7-4 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Conoco Norway Inc. with Mærsk Jutlander, 02.06.1997 to 21.06.1997 (19 days), to 2 560,0 m in the Tor Formation.
Water depth126,0 m
Total depth2 560,0 m MD
Vertical depth2 546,3 m TVD
Bottom-hole temperature75 °C
Max inclination9,9°
Rotary table23,0 m
Formation at total depthTor Formation
RigMærsk Jutlander
Spud02.06.1997
Completed21.06.1997
OperatorConoco Norway Inc.
Position59,2583 N, 2,2664 E
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 75 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 226,0 | 36" | 226,0 | - |
| Surface casing | 13 3/8" | 1 188,0 | 17 1/4" | 1 190,0 | 1,90 LOT |
| Intermediate | 9 5/8" | 1 931,0 | 12 1/4" | 1 931,0 | 1,59 LOT |
| Open hole | - | 2 560,0 | 8 1/2" | 2 560,0 | - |
Mud weight
11 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, kcl/glycol/gem, kcl/polymer, spud mud.