25/8-C-12 A
Development, productionProducingOil
Drilled by Vår Energi ASA with Ringhorne in Balder, 11.04.2026 to 12.07.2026 (92 days), to 7 349,0 m.
Water depth128,5 m
Total depth7 349,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud11.04.2026
Completed12.07.2026
OperatorVår Energi ASA
Position59,2660 N, 2,4498 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 247 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-12 same well | 0,0 | 7 558,0 | - | - | 2005 |
| 25/8-C-13 | 0,0 | 4 813,0 | - | - | 2003 |
| 25/8-C-13 A | 0,0 | 5 481,0 | - | - | 2003 |
| 25/8-C-13 B | 0,0 | 4 508,0 | - | - | 2012 |
| 25/8-C-13 C | 0,0 | 4 536,0 | - | - | 2012 |
| 25/8-C-23 | 0,0 | 7 800,0 | - | - | 2007 |
| 25/8-C-23 A | 0,0 | 5 724,0 | - | - | 2011 |
| 25/8-C-23 B | 0,0 | 6 414,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.