Fields / Balder / 25/8-C-12

25/8-C-12

Development, injectionPluggedGas

Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Balder, 23.04.2005 to 21.08.2005 (120 days), to 7 558,0 m.

Water depth128,5 m
Total depth7 558,0 m MD
Vertical depth1 809,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud23.04.2005
Completed21.08.2005
OperatorExxonMobil Exploration and Production Norway AS
Position59,2660 N, 2,4498 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient59 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/8-C-12 A same well0,07 349,0--2026
25/8-C-130,04 813,0--2003
25/8-C-13 A0,05 481,0--2003
25/8-C-13 B0,04 508,0--2012
25/8-C-13 C0,04 536,0--2012
25/8-C-230,07 800,0--2007
25/8-C-23 A0,05 724,0--2011
25/8-C-23 B0,06 414,0--2011

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗