Fields / Ringhorne Øst / 25/8-C-14 A
25/8-C-14 A
Development, observationPluggedOil
Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Ringhorne Øst, 04.01.2006 to 10.02.2006 (37 days), to 5 405,0 m.
Water depth128,5 m
Total depth5 405,0 m MD
Vertical depth2 262,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud04.01.2006
Completed10.02.2006
OperatorExxonMobil Exploration and Production Norway AS
Position59,2660 N, 2,4500 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Ringhorne Øst report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-14 same well | 0,0 | 5 612,0 | - | - | 2004 |
| 25/8-C-14 B same well | 0,0 | 4 920,0 | - | - | 2006 |
| 25/8-C-24 | 0,0 | 5 442,0 | - | - | 2007 |
| 25/8-C-24 A | 0,0 | 5 504,0 | - | - | 2007 |
| 25/8-C-24 B | 0,0 | 5 956,0 | - | - | 2022 |
| 25/8-C-11 | 0,0 | 5 992,0 | - | - | 2003 |
| 25/8-C-11 A | 0,0 | 6 042,0 | - | - | 2003 |
| 25/8-C-11 B | 0,0 | 3 888,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.