25/8-C-24 A
Development, productionPluggedOil
Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Balder, 13.02.2007 to 15.03.2007 (30 days), to 5 504,0 m.
Water depth128,5 m
Total depth5 504,0 m MD
Vertical depth1 804,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud13.02.2007
Completed15.03.2007
OperatorExxonMobil Exploration and Production Norway AS
Position59,2660 N, 2,4499 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-24 same well | 0,0 | 5 442,0 | - | - | 2007 |
| 25/8-C-24 B same well | 0,0 | 5 956,0 | - | - | 2022 |
| 25/8-C-13 | 0,0 | 4 813,0 | - | - | 2003 |
| 25/8-C-13 A | 0,0 | 5 481,0 | - | - | 2003 |
| 25/8-C-13 B | 0,0 | 4 508,0 | - | - | 2012 |
| 25/8-C-13 C | 0,0 | 4 536,0 | - | - | 2012 |
| 25/8-C-14 | 0,0 | 5 612,0 | - | - | 2004 |
| 25/8-C-14 A | 0,0 | 5 405,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.