25/8-C-14
Development, observationPlugged
Drilled by Esso Exploration and Production Norway A/S with Ringhorne in Balder, 12.06.2004 to 11.07.2004 (29 days), to 5 612,0 m.
Water depth128,5 m
Total depth5 612,0 m MD
Vertical depth1 838,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud12.06.2004
Completed11.07.2004
OperatorEsso Exploration and Production Norway A/S
Position59,2660 N, 2,4500 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 60 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-14 A same well | 0,0 | 5 405,0 | - | - | 2006 |
| 25/8-C-14 B same well | 0,0 | 4 920,0 | - | - | 2006 |
| 25/8-C-24 | 0,0 | 5 442,0 | - | - | 2007 |
| 25/8-C-24 A | 0,0 | 5 504,0 | - | - | 2007 |
| 25/8-C-24 B | 0,0 | 5 956,0 | - | - | 2022 |
| 25/8-C-11 | 0,0 | 5 992,0 | - | - | 2003 |
| 25/8-C-11 A | 0,0 | 6 042,0 | - | - | 2003 |
| 25/8-C-11 B | 0,0 | 3 888,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.