Fields / 25/8-U-18
25/8-U-18
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Bucentaur, 03.07.1997 to 03.07.1997 (0 days), to 164,5 m.
Water depth126,5 m
Total depth164,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud03.07.1997
Completed03.07.1997
OperatorEsso Exploration and Production Norway A/S
Position59,4629 N, 2,4054 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.