Fields / 25/8-U-26
25/8-U-26
Other, shallow gasPlugged
Drilled by Vår Energi AS with Scarabeo 8, 11.04.2021 to 14.04.2021 (3 days), to 1 107,0 m.
Water depth129,0 m
Total depth1 107,0 m MD
Vertical depth1 107,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud11.04.2021
Completed14.04.2021
OperatorVår Energi AS
Position59,2908 N, 2,3747 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.