Fields / 3/7-8 S
3/7-8 S
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by DONG E&P Norge AS with Mærsk Giant, 09.12.2012 to 03.03.2013 (84 days), to 4 188,0 m in the Zechstein Group.
Water depth65,0 m
Total depth4 188,0 m MD
Vertical depth3 733,0 m TVD
Bottom-hole temperature141 °C
Max inclination41,0°
Rotary table45,0 m
Formation at total depthZechstein Group
RigMærsk Giant
Spud09.12.2012
Completed03.03.2013
OperatorDONG E&P Norge AS
Position56,3863 N, 4,2333 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 141 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 197,5 | 36" | 202,5 | - |
| Surface casing | 20" | 1 123,0 | 24" | 1 126,0 | - |
| Intermediate | 13 3/8" | 2 365,0 | 16" | 2 370,0 | 1,94 LOT |
| Intermediate | 9 5/8" | 3 840,0 | 12 1/4" | 3 844,0 | 2,09 LOT |
| Open hole | - | 4 188,0 | 8 1/2" | 4 188,0 | - |
Mud weight
3 measurements, one dot each, 1,20 to 1,50 g/cm³ against measured depth, bentonitwbm, versatecobm, seawater.