3/7-A-1 AH
Development, productionClosedGas and condensate
Drilled by DONG E&P Norge AS with Mærsk Giant in Trym, 21.10.2010 to 19.11.2010 (29 days), to 4 934,0 m.
Water depth65,4 m
Total depth4 934,0 m MD
Vertical depth3 456,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table42,0 m
Formation at total depth-
RigMærsk Giant
Spud21.10.2010
Completed19.11.2010
OperatorDONG E&P Norge AS
Position56,3819 N, 4,2374 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Trym report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.