3/7-A-2 H
Development, productionProducingGas and condensate
Drilled by DONG E&P Norge AS with Mærsk Giant in Trym, 12.02.2011 to 31.03.2011 (47 days), to 5 121,0 m.
Water depth65,0 m
Total depth5 121,0 m MD
Vertical depth3 499,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table42,0 m
Formation at total depth-
RigMærsk Giant
Spud12.02.2011
Completed31.03.2011
OperatorDONG E&P Norge AS
Position56,3819 N, 4,2376 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Trym report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.