30/10-2
Exploration, wildcatPlugged and abandonedGas
Drilled by Esso Exploration and Production Norway A/S with Drillmaster in Odin, 24.12.1973 to 28.03.1974 (94 days), to 2 755,0 m in the Hardråde Formation.
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 77 °C |
2 released wells in Odin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/10-U-1 | 0,6 | 191,8 | - | - | 1980 |
| 30/10-U-2 | 0,6 | 156,9 | - | - | 1980 |
| 30/10-U-3 | 0,7 | 153,6 | - | - | 1980 |
| 30/10-U-6 | 0,7 | 178,5 | - | - | 1980 |
| 30/10-A-1 | 0,7 | 2 215,0 | - | - | 1984 |
| 30/10-A-10 | 0,7 | 2 759,0 | - | - | 1984 |
| 30/10-A-11 | 0,7 | 2 225,0 | - | - | 1984 |
| 30/10-A-12 | 0,7 | 2 240,0 | - | - | 1984 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 166,0 | 36" | 166,0 | - |
| Intermediate | 20" | 371,0 | 26" | 389,0 | - |
| Intermediate | 13 3/8" | 1 105,0 | 17 1/2" | 1 120,0 | - |
| Intermediate | 9 5/8" | 2 135,0 | 12 1/4" | 2 150,0 | - |
| Open hole | - | 2 755,0 | 8 1/2" | 2 755,0 | - |
Mud weight
7 measurements, one dot each, 1,10 to 1,31 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 2 023,0 - 2 026,0 | 16,5 | - | - | - | 44 995 |