Fields / 30/11-U-4
30/11-U-4
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 27.11.2023 to 28.11.2023 (1 days), to 1 629,0 m.
Water depth107,0 m
Total depth1 629,0 m MD
Vertical depth1 627,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,7 m
Formation at total depth-
RigScarabeo 8
Spud27.11.2023
Completed28.11.2023
OperatorAker BP ASA
Position60,1798 N, 2,5898 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/11-C-2 H | 0,0 | - | - | - | 2025 |
| 30/11-C-6 Y1H | 0,0 | - | - | - | 2025 |
| 30/11-C-5 H | 0,0 | - | - | - | 2025 |
| 30/11-C-3 Y1H | 0,0 | - | - | - | 2025 |
| 30/11-C-3 Y2H | 0,0 | - | - | - | - |
| 30/11-C-4 H | 0,0 | - | - | - | 2025 |
| 30/11-14 | 1,3 | 3 467,0 | 125 °C | 1,39 | 2016 |
| 30/11-14 A | 1,3 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.