WellplannerNorwegian shelf well data

Fields / Huldra / 30/2-A-6

30/2-A-6

Development, productionPlugged and abandonedGas

Drilled by Statoil ASA (old) with Mærsk Gallant in Huldra, 20.07.2001 to 16.09.2001 (58 days), to 4 330,0 m.

Water depth125,0 m
Total depth4 330,0 m MD
Vertical depth3 923,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table49,0 m
Formation at total depth-
RigMærsk Gallant
Spud20.07.2001
Completed16.09.2001
OperatorStatoil ASA (old)
Position60,8560 N, 2,6502 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Huldra gradient36,8 °C/km
Estimated at total depth from the gradient142 °C

The gradient is the median of 5 released wells in Huldra with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/2-A-90,05 710,0--2001
30/2-A-50,04 090,0--2001
30/2-A-80,04 474,0--2000
30/2-A-110,05 048,0--2001
30/2-4 S0,04 325,0-2,012008
30/2-A-40,04 840,0--2000
30/2-31,04 325,0160 °C1,891992
30/2-11,44 243,0164 °C1,911982

Casing and formation tests

No casing programme is reported for this wellbore.