30/2-A-6
Development, productionPlugged and abandonedGas
Drilled by Statoil ASA (old) with Mærsk Gallant in Huldra, 20.07.2001 to 16.09.2001 (58 days), to 4 330,0 m.
Water depth125,0 m
Total depth4 330,0 m MD
Vertical depth3 923,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table49,0 m
Formation at total depth-
RigMærsk Gallant
Spud20.07.2001
Completed16.09.2001
OperatorStatoil ASA (old)
Position60,8560 N, 2,6502 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Huldra gradient | 36,8 °C/km |
| Estimated at total depth from the gradient | 142 °C |
The gradient is the median of 5 released wells in Huldra with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.