30/2-A-8
Development, productionPlugged and abandonedGas
Drilled by Den norske stats oljeselskap a.s with Mærsk Gallant in Huldra, 03.11.2000 to 04.01.2001 (62 days), to 4 474,0 m.
Water depth125,0 m
Total depth4 474,0 m MD
Vertical depth3 834,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table49,0 m
Formation at total depth-
RigMærsk Gallant
Spud03.11.2000
Completed04.01.2001
OperatorDen norske stats oljeselskap a.s
Position60,8560 N, 2,6502 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Huldra gradient | 36,8 °C/km |
| Estimated at total depth from the gradient | 139 °C |
The gradient is the median of 5 released wells in Huldra with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.