30/3-1
Exploration, appraisalSuspendedShows
Drilled by Den norske stats oljeselskap a.s with Norskald in Huldra, 11.06.1979 to 07.09.1979 (88 days), to 3 718,0 m in the Åsgard Formation.
Water depth138,0 m
Total depth3 718,0 m MD
Vertical depth3 716,0 m TVD
Bottom-hole temperature99 °C
Max inclination2,0°
Rotary table25,0 m
Formation at total depthÅsgard Formation
RigNorskald
Spud11.06.1979
Completed07.09.1979
OperatorDen norske stats oljeselskap a.s
Position60,9043 N, 2,6699 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 99 °C |
| Huldra gradient | 36,8 °C/km |
| Estimated at total depth from the gradient | 135 °C |
The gradient is the median of 5 released wells in Huldra with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 212,0 | 36" | 212,0 | - |
| Surface casing | 20" | 985,0 | 26" | 999,0 | 1,38 LOT |
| Liner | 16" | 1 804,0 | 19 1/2" | 1 804,0 | 1,52 LOT |
| Intermediate | 13 3/8" | 2 423,0 | 17 1/2" | 2 430,0 | 1,96 LOT |
| Intermediate | 9 5/8" | 3 718,0 | 12 1/4" | 3 718,0 | - |
Mud weight
5 measurements, one dot each, 1,00 to 1,85 g/cm³ against measured depth, seawater.