30/6-14

Exploration, wildcatPlugged and abandonedOil

Drilled by Norsk Hydro Produksjon AS with Treasure Scout, 17.12.1983 to 08.02.1984 (53 days), to 2 900,0 m in the Statfjord Group.

Water depth148,0 m
Total depth2 900,0 m MD
Vertical depth2 900,0 m TVD
Bottom-hole temperature114 °C
Max inclination3,0°
Rotary table23,0 m
Formation at total depthStatfjord Group
RigTreasure Scout
Spud17.12.1983
Completed08.02.1984
OperatorNorsk Hydro Produksjon AS
Position60,6355 N, 2,9894 E

Formations

26 tops reported, measured depth in metres.

GroupsNordland Group, top 171,0 mNordland GpHordaland Group, top 854,0 mHordaland GpRogaland Group, top 1 857,0 mRogaland GpShetland Group, top 2 122,0 mShetland GpCromer Knoll Group, top 2 251,5 mViking Group, top 2 275,0 mViking GpBrent Group, top 2 560,0 mDunlin Group, top 2 589,0 mDunlin GpStatfjord Group, top 2 783,5 mStatfjord GpFormationsUtsira Formation, top 706,0 mUtsira FmBalder Formation, top 1 857,0 mSele Formation, top 1 920,0 mLista Formation, top 1 952,0 mLista FmVåle Formation, top 2 098,0 mVåle FmDraupne Formation, top 2 275,0 mHeather Formation, top 2 334,0 mIntra Heather Fm Ss, top 2 407,0 mHeather Formation, top 2 432,0 mHeather FmEtive Formation, top 2 560,0 mDrake Formation, top 2 589,0 mCook Formation, top 2 679,0 mBurton Formation, top 2 696,0 mAmundsen Formation, top 2 734,0 mNansen Formation, top 2 783,5 mEiriksson Formation, top 2 799,0 mRaude Formation, top 2 855,0 m1715001 0001 5002 0002 5002 900

Temperature

Reported at total depth114 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/4-13,51 000,038 °C-1979
31/4-23,62 900,082 °C1,561979
30/6-236,13 209,5133 °C1,401990
30/6-23 R6,13 207,5-1,221993
30/6-56,33 550,0126 °C1,431981
31/4-116,63 271,0108 °C1,502000
31/4-77,62 505,0106 °C1,401984
31/4-47,73 150,0-1,401980

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"258,036"260,0-
Surface casing20"601,026"618,01,79 LOT
Intermediate13 3/8"1 648,017 1/2"1 675,01,74 LOT
Intermediate9 5/8"2 885,012 1/4"2 900,0-

Mud weight

7 measurements, one dot each, 1,10 to 1,25 g/cm³ against measured depth, water based.

1,11,21,305001 0001 5002 0002 500495,0 m: 1,10 g/cm³, WATER BASED1 365,0 m: 1,12 g/cm³, WATER BASED1 650,0 m: 1,13 g/cm³, WATER BASED1 710,0 m: 1,25 g/cm³, WATER BASED2 195,0 m: 1,24 g/cm³, WATER BASED2 280,0 m: 1,25 g/cm³, WATER BASED2 360,0 m: 1,24 g/cm³, WATER BASED

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
12 783,0 - 2 787,050,8--13-