Fields / 31/4-1
31/4-1
Exploration, wildcatJunked
Drilled by Norsk Hydro Produksjon AS with Norskald, 09.09.1979 to 25.09.1979 (16 days), to 1 000,0 m in the Hordaland Group.
Water depth144,0 m
Total depth1 000,0 m MD
Vertical depth-
Bottom-hole temperature38 °C
Max inclination-
Rotary table25,0 m
Formation at total depthHordaland Group
RigNorskald
Spud09.09.1979
Completed25.09.1979
OperatorNorsk Hydro Produksjon AS
Position60,6051 N, 3,0090 E
Formations
3 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 38 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 231,0 | 36" | 232,0 | - |
| Open hole | - | 1 000,0 | 26" | 1 000,0 | - |