30/6-9 R
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Oseberg, 09.05.1990 to 12.05.1990 (3 days), to 3 476,0 m in the Lunde Formation.
Water depth107,0 m
Total depth3 476,0 m MD
Vertical depth3 472,0 m TVD
Bottom-hole temperature-
Max inclination5,0°
Rotary table23,0 m
Formation at total depthLunde Formation
RigPolar Pioneer
Spud09.05.1990
Completed12.05.1990
OperatorNorsk Hydro Produksjon AS
Position60,5007 N, 2,7815 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 131 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-9 same well | 0,0 | 3 476,0 | 116 °C | 1,32 | 1982 |
| 30/9-B-1 | 2,7 | 3 185,0 | - | - | 1992 |
| 30/9-B-1 A | 2,7 | 3 870,0 | - | - | 1992 |
| 30/9-B-1 B | 2,7 | 4 885,0 | - | - | 2002 |
| 30/9-B-1 C | 2,7 | 5 660,0 | - | - | 2002 |
| 30/9-B-1 D | 2,7 | 5 746,0 | - | - | 2016 |
| 30/9-U-1 | 2,7 | - | - | - | - |
| 30/9-B-7 | 2,7 | 4 569,0 | - | - | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.