WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-B-51 AH

30/6-B-51 AH

Development, productionPlugged and abandonedOil

Drilled by Norsk Hydro Produksjon AS with West Vanguard in Oseberg, 23.01.1996 to 26.02.1996 (34 days), to 4 606,0 m.

Water depth105,0 m
Total depth4 606,0 m MD
Vertical depth2 674,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud23.01.1996
Completed26.02.1996
OperatorNorsk Hydro Produksjon AS
Position60,5333 N, 2,7403 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient101 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-B-51 H same well0,03 836,0--1995
30/6-151,43 972,0112 °C1,501984
30/6-C-27 AH1,43 761,0--1991
30/6-C-27 H1,42 995,0--1991
30/6-21,72 890,078 °C1,501979
30/6-U-271,71 029,0--2016
30/6-H-11,76 873,0--2019
30/6-H-91,74 747,0--2018

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗