30/6-C-2 A
Exploration, wildcatPluggedOil and gas
Drilled by Equinor Energy AS with Oseberg C in Oseberg, 19.05.2023 to 29.08.2024 (468 days), to 6 167,0 m in the Eiriksson Formation.
Water depth100,0 m
Total depth6 167,0 m MD
Vertical depth2 958,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,3 m
Formation at total depthEiriksson Formation
RigOseberg C
Spud19.05.2023
Completed29.08.2024
OperatorEquinor Energy AS
Position60,6082 N, 2,7760 E
Formations
14 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 111 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-2 same well | 0,0 | 4 920,0 | - | - | 1994 |
| 30/6-C-2 B same well | 0,0 | 6 997,0 | - | - | 2024 |
| 30/6-C-6 | 0,0 | 3 823,0 | - | - | 1990 |
| 30/6-C-6 A | 0,0 | 3 733,0 | - | - | 1995 |
| 30/6-C-6 B | 0,0 | 4 146,0 | - | - | 1995 |
| 30/6-C-6 C | 0,0 | 7 202,0 | - | - | 2002 |
| 30/6-C-6 D | 0,0 | 7 143,0 | - | - | 2002 |
| 30/6-C-6 E | 0,0 | 7 284,0 | - | - | 2015 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Intermediate | 13 3/8" | 2 607,0 | 17 1/2" | 2 607,0 | 1,69 FIT |
| Liner | 9 5/8" | 4 724,0 | 12 1/4" | 4 724,0 | 1,67 FIT |
| Open hole | - | 6 167,0 | 8 1/2" | - | - |
Mud weight
18 measurements, one dot each, 1,30 to 1,61 g/cm³ against measured depth, carbosea, delta-teq.