WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-2

30/6-C-2

Development, injectionPluggedWater

Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 01.09.1994 to 18.09.1994 (17 days), to 4 920,0 m.

Water depth108,0 m
Total depth4 920,0 m MD
Vertical depth2 869,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud01.09.1994
Completed18.09.1994
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient107 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-2 A same well0,06 167,0-1,612023
30/6-C-2 B same well0,06 997,0--2024
30/6-C-60,03 823,0--1990
30/6-C-6 A0,03 733,0--1995
30/6-C-6 B0,04 146,0--1995
30/6-C-6 C0,07 202,0--2002
30/6-C-6 D0,07 143,0--2002
30/6-C-6 E0,07 284,0--2015

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗