30/6-C-6
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Oseberg, 14.03.1990 to 23.04.1990 (40 days), to 3 823,0 m.
Water depth108,0 m
Total depth3 823,0 m MD
Vertical depth2 715,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigTransocean 8
Spud14.03.1990
Completed23.04.1990
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-6 A same well | 0,0 | 3 733,0 | - | - | 1995 |
| 30/6-C-6 B same well | 0,0 | 4 146,0 | - | - | 1995 |
| 30/6-C-6 C same well | 0,0 | 7 202,0 | - | - | 2002 |
| 30/6-C-6 D same well | 0,0 | 7 143,0 | - | - | 2002 |
| 30/6-C-6 E same well | 0,0 | 7 284,0 | - | - | 2015 |
| 30/6-C-2 | 0,0 | 4 920,0 | - | - | 1994 |
| 30/6-C-2 A | 0,0 | 6 167,0 | - | 1,61 | 2023 |
| 30/6-C-2 B | 0,0 | 6 997,0 | - | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.