30/6-C-5 A
Development, injectionInjectingGas
Drilled by Equinor Energy AS with Oseberg C in Oseberg, 20.09.2018 to 30.09.2018 (10 days), to 4 895,0 m.
Water depth108,6 m
Total depth4 895,0 m MD
Vertical depth2 603,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,3 m
Formation at total depth-
RigOseberg C
Spud20.09.2018
Completed30.09.2018
OperatorEquinor Energy AS
Position60,6082 N, 2,7759 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 97 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-5 same well | 0,0 | 4 062,0 | - | - | 1989 |
| 30/6-C-1 | 0,0 | 6 658,0 | - | - | 1992 |
| 30/6-C-1 A | 0,0 | 6 642,0 | - | - | 2020 |
| 30/6-C-6 | 0,0 | 3 823,0 | - | - | 1990 |
| 30/6-C-6 A | 0,0 | 3 733,0 | - | - | 1995 |
| 30/6-C-6 B | 0,0 | 4 146,0 | - | - | 1995 |
| 30/6-C-6 C | 0,0 | 7 202,0 | - | - | 2002 |
| 30/6-C-6 D | 0,0 | 7 143,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.