30/6-C-1
Development, injectionPluggedWater
Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 03.06.1992 to 31.08.1992 (89 days), to 6 658,0 m.
Water depth108,0 m
Total depth6 658,0 m MD
Vertical depth2 820,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud03.06.1992
Completed31.08.1992
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-1 A same well | 0,0 | 6 642,0 | - | - | 2020 |
| 30/6-C-5 | 0,0 | 4 062,0 | - | - | 1989 |
| 30/6-C-5 A | 0,0 | 4 895,0 | - | - | 2018 |
| 30/6-C-2 | 0,0 | 4 920,0 | - | - | 1994 |
| 30/6-C-2 A | 0,0 | 6 167,0 | - | 1,61 | 2023 |
| 30/6-C-2 B | 0,0 | 6 997,0 | - | - | 2024 |
| 30/6-C-6 | 0,0 | 3 823,0 | - | - | 1990 |
| 30/6-C-6 A | 0,0 | 3 733,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.