Fields / 30/6-U-16
30/6-U-16
Other, soil drillingPlugged and abandoned
Drilled by Norsk Hydro Produksjon AS, 07.01.1988 to 07.01.1988 (0 days), to 26,1 m.
Water depth-
Total depth26,1 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
Rig-
Spud07.01.1988
Completed07.01.1988
OperatorNorsk Hydro Produksjon AS
Position60,6085 N, 2,7755 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-U-20 | 0,0 | 103,6 | - | - | 1988 |
| 30/6-U-19 | 0,0 | 26,1 | - | - | 1988 |
| 30/6-U-14 | 0,0 | 45,2 | - | - | 1988 |
| 30/6-U-18 | 0,0 | 26,5 | - | - | 1988 |
| 30/6-C-1 | 0,0 | 6 658,0 | - | - | 1992 |
| 30/6-C-1 A | 0,0 | 6 642,0 | - | - | 2020 |
| 30/6-C-5 | 0,0 | 4 062,0 | - | - | 1989 |
| 30/6-C-5 A | 0,0 | 4 895,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.