Fields / Oseberg / 30/9-B-12 A
30/9-B-12 A
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 18.01.1991 to 02.03.1991 (43 days), to 3 992,0 m.
Water depth109,0 m
Total depth3 992,0 m MD
Vertical depth2 864,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud18.01.1991
Completed02.03.1991
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8287 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 107 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-12 same well | 0,0 | 3 880,0 | - | - | 1990 |
| 30/9-B-12 B same well | 0,0 | 6 270,0 | - | - | 1999 |
| 30/9-B-12 C same well | 0,0 | 5 020,0 | - | - | 2011 |
| 30/9-B-6 | 0,0 | 5 977,0 | - | - | 1993 |
| 30/9-B-6 A | 0,0 | 7 670,0 | - | - | 1994 |
| 30/9-B-6 B | 0,0 | 8 237,0 | - | - | 2022 |
| 30/9-B-11 | 0,0 | 5 469,0 | - | - | 1993 |
| 30/9-B-11 A | 0,0 | 6 220,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.