WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-12

30/9-B-12

Development, productionPlugged

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 14.07.1990 to 09.09.1990 (57 days), to 3 880,0 m.

Water depth109,0 m
Total depth3 880,0 m MD
Vertical depth2 947,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud14.07.1990
Completed09.09.1990
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8287 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient110 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-12 A same well0,03 992,0--1991
30/9-B-12 B same well0,06 270,0--1999
30/9-B-12 C same well0,05 020,0--2011
30/9-B-60,05 977,0--1993
30/9-B-6 A0,07 670,0--1994
30/9-B-6 B0,08 237,0--2022
30/9-B-110,05 469,0--1993
30/9-B-11 A0,06 220,0--1993

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗