Fields / Oseberg / 30/9-B-12 B
30/9-B-12 B
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 04.05.1999 to 11.07.1999 (68 days), to 6 270,0 m.
Water depth109,0 m
Total depth6 270,0 m MD
Vertical depth2 782,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud04.05.1999
Completed11.07.1999
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8287 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 104 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-12 same well | 0,0 | 3 880,0 | - | - | 1990 |
| 30/9-B-12 A same well | 0,0 | 3 992,0 | - | - | 1991 |
| 30/9-B-12 C same well | 0,0 | 5 020,0 | - | - | 2011 |
| 30/9-B-6 | 0,0 | 5 977,0 | - | - | 1993 |
| 30/9-B-6 A | 0,0 | 7 670,0 | - | - | 1994 |
| 30/9-B-6 B | 0,0 | 8 237,0 | - | - | 2022 |
| 30/9-B-11 | 0,0 | 5 469,0 | - | - | 1993 |
| 30/9-B-11 A | 0,0 | 6 220,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.