Fields / Troll / 31/5-I-22 BY1H
31/5-I-22 BY1H
Development, productionClosedOil
Drilled by Statoil Petroleum AS with Stena Don in Troll, 28.07.2013 to 17.08.2013 (20 days), to 5 289,0 m.
Water depth315,6 m
Total depth5 289,0 m MD
Vertical depth1 580,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigStena Don
Spud28.07.2013
Completed17.08.2013
OperatorStatoil Petroleum AS
Position60,7285 N, 3,5777 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-I-22 AH same well | 0,0 | 4 500,0 | - | - | 1997 |
| 31/5-I-22 BY2H same well | 0,0 | 5 608,0 | - | - | 2013 |
| 31/5-I-22 BY3H same well | 0,0 | 4 630,0 | - | - | 2013 |
| 31/5-I-22 H same well | 0,0 | 2 002,0 | - | - | 1997 |
| 31/5-I-21 AH | 0,0 | 5 060,0 | - | - | 1998 |
| 31/5-I-21 BY1H | 0,0 | 5 327,0 | - | - | 2009 |
| 31/5-I-21 BY2H | 0,0 | 5 208,0 | - | - | 2009 |
| 31/5-I-21 CY1H | 0,0 | 4 966,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.