WellplannerNorwegian shelf well data

Fields / Troll / 31/5-I-22 BY3H

31/5-I-22 BY3H

Development, productionClosedOil

Drilled by Statoil Petroleum AS with Stena Don in Troll, 02.09.2013 to 08.09.2013 (6 days), to 4 630,0 m.

Water depth315,6 m
Total depth4 630,0 m MD
Vertical depth1 580,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigStena Don
Spud02.09.2013
Completed08.09.2013
OperatorStatoil Petroleum AS
Position60,7285 N, 3,5777 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-I-22 AH same well0,04 500,0--1997
31/5-I-22 BY1H same well0,05 289,0--2013
31/5-I-22 BY2H same well0,05 608,0--2013
31/5-I-22 H same well0,02 002,0--1997
31/5-I-21 AH0,05 060,0--1998
31/5-I-21 BY1H0,05 327,0--2009
31/5-I-21 BY2H0,05 208,0--2009
31/5-I-21 CY1H0,04 966,0--2015

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗