WellplannerNorwegian shelf well data

Fields / Troll / 31/6-2 R

31/6-2 R

Exploration, appraisalPlugged and abandonedGas

Drilled by Den norske stats oljeselskap a.s with DEEPSEA BERGEN decom in Troll, 31.07.1984 to 08.09.1984 (39 days), to 2 235,0 m in the Hegre Group.

Water depth303,0 m
Total depth2 235,0 m MD
Vertical depth2 235,0 m TVD
Bottom-hole temperature72 °C
Max inclination1,0°
Rotary table23,0 m
Formation at total depthHegre Group
RigDEEPSEA BERGEN decom
Spud31.07.1984
Completed08.09.1984
OperatorDen norske stats oljeselskap a.s
Position60,5828 N, 3,9155 E

Formations

27 tops reported, measured depth in metres.

GroupsNordland Group, top 326,0 mNordland GpHordaland Group, top 505,0 mHordaland GpRogaland Group, top 626,0 mRogaland GpShetland Group, top 968,0 mShetland GpCromer Knoll Group, top 1 128,0 mCromer Knoll GpViking Group, top 1 322,0 mViking GpBrent Group, top 1 931,0 mDunlin Group, top 1 975,0 mDunlin GpStatfjord Group, top 2 164,0 mHegre Group, top 2 198,0 mFormationsBalder Formation, top 626,0 mBalder FmSele Formation, top 776,0 mSele FmLista Formation, top 885,0 mLista FmHardråde Formation, top 968,0 mUndifferentiated, top 978,0 mUndifferentiatedRødby Formation, top 1 128,0 mRødby FmÅsgard Formation, top 1 223,0 mÅsgard FmDraupne Formation, top 1 322,0 mDraupne FmHeather Formation, top 1 435,0 mSognefjord Formation, top 1 460,0 mSognefjord FmHeather Formation, top 1 625,0 mFensfjord Formation, top 1 642,0 mFensfjord FmKrossfjord Formation, top 1 875,0 mHeather Formation, top 1 910,0 mHeather FmDrake Formation, top 1 975,0 mDrake FmJohansen Formation, top 2 055,0 mJohansen FmAmundsen Formation, top 2 138,0 mAmundsen Fm3265001 0001 5002 0002 235

Temperature

Reported at total depth72 °C
Troll gradient37,2 °C/km
Estimated at total depth from the gradient75 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/6-2 same well0,02 020,065 °C1,301983
31/6-47,2820,037 °C1,091984
31/6-57,22 082,061 °C1,261984
31/6-310,12 250,076 °C1,251983
31/6-U-2410,9----
31/6-U-2012,4----
31/6-A-4012,41 668,0--1997
31/6-A-3712,42 708,0--1998

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"412,036"412,0-
Surface casing20"801,026"818,01,56 LOT
Intermediate13 3/8"902,017 1/2"920,01,76 LOT
Intermediate9 5/8"1 391,012 1/4"1 400,01,61 LOT
Liner7"2 004,08 1/2"2 020,0-
Open hole-2 235,06"2 235,0-

Mud weight

4 measurements, one dot each, 1,10 to 1,11 g/cm³ against measured depth, water based.

1,11,205001 0001 5002 0002 005,0 m: 1,10 g/cm³, WATER BASED2 075,0 m: 1,10 g/cm³, WATER BASED2 235,0 m: 1,11 g/cm³, WATER BASED2 235,0 m: 1,11 g/cm³, WATER BASED

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
11 506,0 - 1 510,019,1----
Show on the mapOpen on FactPages ↗