Fields / 31/6-3
31/6-3
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with Nortrym, 01.11.1983 to 26.12.1983 (55 days), to 2 250,0 m in the Hegre Group.
Water depth301,0 m
Total depth2 250,0 m MD
Vertical depth2 250,0 m TVD
Bottom-hole temperature76 °C
Max inclination0,8°
Rotary table25,0 m
Formation at total depthHegre Group
RigNortrym
Spud01.11.1983
Completed26.12.1983
OperatorNorsk Hydro Produksjon AS
Position60,5013 N, 3,9982 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 76 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 32/7-1 | 5,9 | 2 036,0 | - | - | 2024 |
| 32/7-U-1 | 5,9 | 742,0 | - | - | 2024 |
| 32/4-3 S | 8,5 | 2 017,0 | - | - | 2019 |
| 32/4-2 | 8,6 | 1 184,0 | - | - | 2019 |
| 31/6-2 | 10,1 | 2 020,0 | 65 °C | 1,30 | 1983 |
| 31/6-2 R | 10,1 | 2 235,0 | 72 °C | 1,11 | 1984 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 399,0 | 36" | 400,0 | - |
| Surface casing | 20" | 600,0 | 26" | 618,0 | 1,39 LOT |
| Intermediate | 13 3/8" | 1 360,0 | 17 1/2" | 1 365,0 | 1,82 LOT |
| Open hole | - | 2 250,0 | 12 1/4" | 2 250,0 | - |
Mud weight
7 measurements, one dot each, 1,10 to 1,25 g/cm³ against measured depth, water based.