Fields / 32/4-3 S
32/4-3 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Equinor Energy AS with West Hercules, 23.09.2019 to 26.10.2019 (33 days), to 2 017,0 m in the Lunde Formation.
Water depth292,0 m
Total depth2 017,0 m MD
Vertical depth2 000,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depthLunde Formation
RigWest Hercules
Spud23.09.2019
Completed26.10.2019
OperatorEquinor Energy AS
Position60,5104 N, 4,1523 E
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 372,0 | 42" | 375,0 | - |
| Surface casing | 20" | 433,0 | 26" | 435,0 | 1,19 FIT |
| Intermediate | 13 3/8" | 593,0 | 17 1/2" | 600,0 | 1,32 FIT |
| Liner | 9 5/8" | 1 192,0 | 12 1/4" | 1 193,0 | 1,43 LOT |
| Open hole | - | 2 017,0 | 8 1/2" | 2 017,0 | - |