Fields / 32/4-2
32/4-2
Exploration, wildcatJunked
Drilled by Equinor Energy AS with West Hercules, 09.09.2019 to 21.09.2019 (12 days), to 1 184,0 m.
Water depth292,0 m
Total depth1 184,0 m MD
Vertical depth1 184,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigWest Hercules
Spud09.09.2019
Completed21.09.2019
OperatorEquinor Energy AS
Position60,5104 N, 4,1550 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 373,0 | 42" | 377,0 | - |
| Surface casing | 13 3/8" | 1 178,0 | 17 1/2" | 1 184,0 | - |