Fields / 34/6-5 S
34/6-5 S
Exploration, wildcatPluggedOil
Drilled by Equinor Energy AS with West Hercules, 18.03.2021 to 08.06.2021 (82 days), to 4 036,0 m in the Nansen Formation.
Water depth385,0 m
Total depth4 036,0 m MD
Vertical depth3 983,0 m TVD
Bottom-hole temperature150 °C
Max inclination24,4°
Rotary table31,0 m
Formation at total depthNansen Formation
RigWest Hercules
Spud18.03.2021
Completed08.06.2021
OperatorEquinor Energy AS
Position61,6013 N, 2,7411 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 150 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/6-2 A | 1,4 | 3 974,0 | - | 1,78 | 2012 |
| 34/6-2 S | 1,4 | 4 335,0 | 152 °C | 1,90 | 2012 |
| 34/6-3 A | 3,0 | 4 019,0 | - | 1,82 | 2014 |
| 34/6-3 S | 3,0 | 4 462,0 | 142 °C | 1,84 | 2014 |
| 34/6-1 S | 3,6 | 4 360,0 | 147 °C | 1,74 | 2002 |
| 34/6-8 A | 3,9 | - | - | - | - |
| 34/6-8 S | 3,9 | 4 153,0 | - | - | 2025 |
| 34/6-9 S | 6,6 | 4 067,0 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Intermediate | 20" | 1 363,0 | 26" | - | - |
| Intermediate | 13 5/8" | 2 420,0 | 17 1/2" | 2 429,0 | 1,83 LOT |
| Liner | 9 5/8" | 3 534,0 | 12 1/4" | 3 484,0 | 2,02 LOT |
| Liner | 7" | 3 831,0 | 8 1/2" | 3 833,0 | - |
| Open hole | - | 4 036,0 | 8 1/2" | 4 036,0 | - |
Mud weight
17 measurements, one dot each, 1,30 to 1,85 g/cm³ against measured depth, exploradrill, versatec.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 3 674,0 - 3 734,0 | - | - | - | 550 | - |