Fields / Visund / 34/8-8 R
34/8-8 R
Exploration, appraisalPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Visund, 16.02.1993 to 09.03.1993 (21 days), to 3 624,0 m in the Lunde Formation.
Water depth340,5 m
Total depth3 624,0 m MD
Vertical depth3 622,0 m TVD
Bottom-hole temperature130 °C
Max inclination6,5°
Rotary table23,0 m
Formation at total depthLunde Formation
RigPolar Pioneer
Spud16.02.1993
Completed09.03.1993
OperatorNorsk Hydro Produksjon AS
Position61,3795 N, 2,4788 E
Formations
33 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 130 °C |
| Drill-stem test at 2 973,0 m | 112 °C |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 133 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-8 same well | 0,0 | 3 625,0 | 125 °C | 1,70 | 1992 |
| 34/8-A-38 H | 1,4 | 4 977,0 | - | - | 2022 |
| 34/8-A-33 H | 1,4 | 1 733,0 | - | - | 2008 |
| 34/8-A-37 H | 1,4 | 6 691,0 | - | - | 2026 |
| 34/8-A-32 H | 1,4 | 6 760,0 | - | - | 2016 |
| 34/8-18 S | 1,4 | 6 068,0 | - | 1,70 | 2019 |
| 34/8-A-36 H | 1,4 | 5 031,0 | - | - | 2018 |
| 34/8-A-34 H | 1,4 | 7 458,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.
Mud weight
23 measurements, one dot each, 1,40 to 1,63 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 2 | 2 921,0 - 2 950,0 | 19,0 | 23,0 | 112 | 956 | 147 100 |
| 1 | 2 960,0 - 2 973,0 | 12,7 | 42,0 | 112 | 775 | 106 300 |