Fields / Visund / 34/8-8
34/8-8
Exploration, appraisalSuspendedOil
Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Visund, 30.06.1992 to 24.08.1992 (55 days), to 3 625,0 m in the Lunde Formation.
Water depth340,5 m
Total depth3 625,0 m MD
Vertical depth3 623,0 m TVD
Bottom-hole temperature125 °C
Max inclination6,5°
Rotary table23,5 m
Formation at total depthLunde Formation
RigTransocean 8
Spud30.06.1992
Completed24.08.1992
OperatorNorsk Hydro Produksjon AS
Position61,3795 N, 2,4788 E
Formations
33 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 125 °C |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 133 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-8 R same well | 0,0 | 3 624,0 | 130 °C | 1,63 | 1993 |
| 34/8-A-38 H | 1,4 | 4 977,0 | - | - | 2022 |
| 34/8-A-33 H | 1,4 | 1 733,0 | - | - | 2008 |
| 34/8-A-37 H | 1,4 | 6 691,0 | - | - | 2026 |
| 34/8-A-32 H | 1,4 | 6 760,0 | - | - | 2016 |
| 34/8-18 S | 1,4 | 6 068,0 | - | 1,70 | 2019 |
| 34/8-A-36 H | 1,4 | 5 031,0 | - | - | 2018 |
| 34/8-A-34 H | 1,4 | 7 458,0 | - | - | 2017 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 451,0 | 36" | 452,0 | - |
| Intermediate | 13 3/8" | 1 351,0 | 17 1/2" | 1 353,0 | 1,66 LOT |
| Intermediate | 9 5/8" | 2 765,0 | 12 1/4" | 2 766,0 | 1,82 LOT |
| Liner | 7" | 3 170,0 | 8 1/2" | 3 625,0 | - |
Mud weight
30 measurements, one dot each, 1,00 to 1,70 g/cm³ against measured depth, water based.