34/8-A-1 BH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Delta in Visund, 10.03.1998 to 13.09.1999 (552 days), to 6 039,0 m.
Water depth335,0 m
Total depth6 039,0 m MD
Vertical depth2 975,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigWest Delta
Spud10.03.1998
Completed13.09.1999
OperatorNorsk Hydro Produksjon AS
Position61,3702 N, 2,4597 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 107 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-1 AH same well | 0,0 | 4 582,0 | - | - | 1997 |
| 34/8-A-1 CH same well | 0,0 | 4 500,0 | - | - | 2019 |
| 34/8-A-1 H same well | 0,0 | 1 176,0 | - | - | 1997 |
| 34/8-A-2 H | 0,0 | 6 310,0 | - | - | 1997 |
| 34/8-A-26 H | 0,0 | 5 609,0 | - | - | 2009 |
| 34/8-A-37 H | 0,0 | 6 691,0 | - | - | 2026 |
| 34/8-A-3 AH | 0,0 | 5 433,0 | - | - | 2006 |
| 34/8-A-3 H | 0,0 | 3 775,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.