WellplannerNorwegian shelf well data

Fields / Visund / 34/8-A-3 AH

34/8-A-3 AH

Development, productionPluggedGas

Drilled by Statoil ASA (old) with Visund in Visund, 21.02.2006 to 08.07.2006 (137 days), to 5 433,0 m.

Water depth335,0 m
Total depth5 433,0 m MD
Vertical depth2 906,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud21.02.2006
Completed08.07.2006
OperatorStatoil ASA (old)
Position61,3703 N, 2,4596 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Visund gradient39,6 °C/km
Estimated at total depth from the gradient105 °C

The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/8-A-3 H same well0,03 775,0--1998
34/8-A-4 AH0,07 651,0--2002
34/8-A-4 BH0,07 579,0--2006
34/8-A-4 H0,05 658,0--2002
34/8-A-2 H0,06 310,0--1997
34/8-A-32 H0,06 760,0--2016
34/8-A-1 AH0,04 582,0--1997
34/8-A-1 BH0,06 039,0--1998

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗