WellplannerNorwegian shelf well data

Fields / Visund / 34/8-A-2 H

34/8-A-2 H

Development, injectionProducingGas

Drilled by Norsk Hydro Produksjon AS with West Delta in Visund, 22.11.1997 to 25.10.2001 (1433 days), to 6 310,0 m.

Water depth335,0 m
Total depth6 310,0 m MD
Vertical depth2 800,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigWest Delta
Spud22.11.1997
Completed25.10.2001
OperatorNorsk Hydro Produksjon AS
Position61,3702 N, 2,4597 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Visund gradient39,6 °C/km
Estimated at total depth from the gradient100 °C

The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/8-A-1 AH0,04 582,0--1997
34/8-A-1 BH0,06 039,0--1998
34/8-A-1 CH0,04 500,0--2019
34/8-A-1 H0,01 176,0--1997
34/8-A-3 AH0,05 433,0--2006
34/8-A-3 H0,03 775,0--1998
34/8-A-37 H0,06 691,0--2026
34/8-A-38 H0,04 977,0--2022

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗