Fields / Fram H-nord / 35/11-15 S
35/11-15 S
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Transocean Winner in Fram H-nord, 01.04.2007 to 28.06.2007 (88 days), to 3 250,0 m in the Heather Formation.
Water depth363,0 m
Total depth3 250,0 m MD
Vertical depth2 987,0 m TVD
Bottom-hole temperature123 °C
Max inclination61,2°
Rotary table26,0 m
Formation at total depthHeather Formation
RigTransocean Winner
Spud01.04.2007
Completed28.06.2007
OperatorNorsk Hydro Produksjon AS
Position61,1140 N, 3,5222 E
Formations
31 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 123 °C |
1 released well in Fram H-Nord report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-U-1 | 2,0 | 388,0 | - | - | 2012 |
| 35/11-A-33 Y1H | 2,0 | 7 308,0 | - | - | 2017 |
| 35/11-A-33 Y2H | 2,0 | 6 994,0 | - | - | 2017 |
| 35/11-A-31 AY1H | 2,0 | 5 223,0 | - | - | 2014 |
| 35/11-A-31 AY2H | 2,0 | 5 488,0 | - | - | 2014 |
| 35/11-A-31 H | 2,0 | 3 562,0 | - | - | 2013 |
| 35/11-11 | 2,3 | 3 225,0 | 115 °C | 1,33 | 1998 |
| 35/11-16 S | 2,7 | 3 554,0 | 118 °C | 1,39 | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 467,0 | 36" | 470,0 | - |
| Surface casing | 20" | 528,0 | 26" | 530,0 | 1,25 LOT |
| Intermediate | 13 3/8" | 1 675,0 | 17 1/2" | 1 680,0 | 1,31 LOT |
| Intermediate | 9 5/8" | 2 821,0 | 12 1/4" | 2 825,0 | 1,74 LOT |
| Open hole | - | 3 203,0 | 8 1/2" | 3 203,0 | - |
Mud weight
14 measurements, one dot each, 1,10 to 1,32 g/cm³ against measured depth, water based.