35/11-11
Exploration, appraisalPlugged and abandonedShows
Drilled by Norsk Hydro Produksjon AS with Transocean Leader in Fram, 16.04.1998 to 22.05.1998 (36 days), to 3 225,0 m in the Drake Formation.
Water depth359,0 m
Total depth3 225,0 m MD
Vertical depth3 224,0 m TVD
Bottom-hole temperature115 °C
Max inclination3,5°
Rotary table23,5 m
Formation at total depthDrake Formation
RigTransocean Leader
Spud16.04.1998
Completed22.05.1998
OperatorNorsk Hydro Produksjon AS
Position61,1087 N, 3,5636 E
Formations
32 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 115 °C |
| Fram gradient | 41,1 °C/km |
| Estimated at total depth from the gradient | 121 °C |
The gradient is the median of 12 released wells in Fram with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-U-1 | 2,3 | 388,0 | - | - | 2012 |
| 35/11-15 S | 2,3 | 3 250,0 | 123 °C | 1,32 | 2007 |
| 35/11-A-31 AY1H | 2,4 | 5 223,0 | - | - | 2014 |
| 35/11-A-31 AY2H | 2,4 | 5 488,0 | - | - | 2014 |
| 35/11-A-31 H | 2,4 | 3 562,0 | - | - | 2013 |
| 35/11-A-33 Y1H | 2,4 | 7 308,0 | - | - | 2017 |
| 35/11-A-33 Y2H | 2,4 | 6 994,0 | - | - | 2017 |
| 35/11-8 S | 2,5 | 3 624,0 | 128 °C | 1,31 | 1996 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 444,0 | 36" | 444,0 | - |
| Surface casing | 13 3/8" | 1 245,0 | 17 1/2" | 1 245,0 | 1,63 LOT |
| Open hole | - | 2 550,0 | 12 1/4" | 2 550,0 | - |
| Open hole | - | 3 225,0 | 8 1/2" | 3 225,0 | - |
Mud weight
12 measurements, one dot each, 1,00 to 1,33 g/cm³ against measured depth, water based.