Fields / Byrding / 35/11-A-33 Y1H
35/11-A-33 Y1H
Development, productionClosedOil
Drilled by Statoil Petroleum AS with Scarabeo 5 in Byrding, 07.02.2017 to 24.05.2017 (106 days), to 7 308,0 m.
Water depth361,0 m
Total depth7 308,0 m MD
Vertical depth3 116,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud07.02.2017
Completed24.05.2017
OperatorStatoil Petroleum AS
Position61,1282 N, 3,5461 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Byrding report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-A-33 Y2H same well | 0,0 | 6 994,0 | - | - | 2017 |
| 35/11-A-31 AY1H | 0,0 | 5 223,0 | - | - | 2014 |
| 35/11-A-31 AY2H | 0,0 | 5 488,0 | - | - | 2014 |
| 35/11-A-31 H | 0,0 | 3 562,0 | - | - | 2013 |
| 35/11-U-1 | 0,1 | 388,0 | - | - | 2012 |
| 35/11-15 S | 2,0 | 3 250,0 | 123 °C | 1,32 | 2007 |
| 35/11-16 S | 2,2 | 3 554,0 | 118 °C | 1,39 | 2014 |
| 35/11-11 | 2,4 | 3 225,0 | 115 °C | 1,33 | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.