35/11-B-22 H
Development, productionProducingOil
Drilled by Statoil Petroleum AS with Stena Don in Fram, 17.06.2016 to 26.07.2016 (39 days), to 5 293,0 m.
Water depth356,0 m
Total depth5 293,0 m MD
Vertical depth2 394,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigStena Don
Spud17.06.2016
Completed26.07.2016
OperatorStatoil Petroleum AS
Position61,0428 N, 3,5997 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fram gradient | 41,1 °C/km |
| Estimated at total depth from the gradient | 87 °C |
The gradient is the median of 12 released wells in Fram with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-B-21 AH | 0,0 | 4 766,0 | - | - | 2006 |
| 35/11-B-21 H | 0,0 | 2 960,0 | - | - | 2006 |
| 35/11-B-23 AY1H | 0,0 | 5 072,0 | - | - | 2008 |
| 35/11-B-23 AY2H | 0,0 | 5 091,0 | - | - | 2008 |
| 35/11-B-23 H | 0,0 | 3 653,0 | - | - | 2007 |
| 35/11-B-24 AH | 0,0 | 2 730,0 | - | - | 2008 |
| 35/11-B-24 H | 0,0 | 1 674,0 | - | - | 2006 |
| 35/11-7 | 1,2 | 2 895,0 | 110 °C | 1,24 | 1992 |
Casing and formation tests
No casing programme is reported for this wellbore.