35/11-B-23 H
Development, observationPluggedOil
Drilled by StatoilHydro Petroleum AS with Bideford Dolphin in Fram, 27.11.2007 to 12.01.2008 (46 days), to 3 653,0 m.
Water depth356,0 m
Total depth3 653,0 m MD
Vertical depth2 536,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud27.11.2007
Completed12.01.2008
OperatorStatoilHydro Petroleum AS
Position61,0427 N, 3,5999 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fram gradient | 41,1 °C/km |
| Estimated at total depth from the gradient | 92 °C |
The gradient is the median of 12 released wells in Fram with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/11-B-23 AY1H same well | 0,0 | 5 072,0 | - | - | 2008 |
| 35/11-B-23 AY2H same well | 0,0 | 5 091,0 | - | - | 2008 |
| 35/11-B-24 AH | 0,0 | 2 730,0 | - | - | 2008 |
| 35/11-B-24 H | 0,0 | 1 674,0 | - | - | 2006 |
| 35/11-B-22 H | 0,0 | 5 293,0 | - | - | 2016 |
| 35/11-B-21 AH | 0,0 | 4 766,0 | - | - | 2006 |
| 35/11-B-21 H | 0,0 | 2 960,0 | - | - | 2006 |
| 35/11-7 | 1,2 | 2 895,0 | 110 °C | 1,24 | 1992 |
Casing and formation tests
No casing programme is reported for this wellbore.