WellplannerNorwegian shelf well data

Fields / Fram / 35/11-B-24 H

35/11-B-24 H

Development, injectionPluggedWater

Drilled by Norsk Hydro Produksjon AS with Bideford Dolphin in Fram, 18.12.2006 to 18.01.2007 (31 days), to 1 674,0 m.

Water depth356,0 m
Total depth1 674,0 m MD
Vertical depth1 360,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud18.12.2006
Completed18.01.2007
OperatorNorsk Hydro Produksjon AS
Position61,0427 N, 3,5999 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Fram gradient41,1 °C/km
Estimated at total depth from the gradient44 °C

The gradient is the median of 12 released wells in Fram with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
35/11-B-24 AH same well0,02 730,0--2008
35/11-B-23 AY1H0,05 072,0--2008
35/11-B-23 AY2H0,05 091,0--2008
35/11-B-23 H0,03 653,0--2007
35/11-B-22 H0,05 293,0--2016
35/11-B-21 AH0,04 766,0--2006
35/11-B-21 H0,02 960,0--2006
35/11-71,22 895,0110 °C1,241992

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗