35/9-1 R
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Gjøa, 03.07.1989 to 27.07.1989 (24 days), to 2 350,0 m in the Basement.
Water depth361,0 m
Total depth2 350,0 m MD
Vertical depth2 348,0 m TVD
Bottom-hole temperature82 °C
Max inclination5,5°
Rotary table23,0 m
Formation at total depthBasement
RigPolar Pioneer
Spud03.07.1989
Completed27.07.1989
OperatorNorsk Hydro Produksjon AS
Position61,3855 N, 3,9844 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 82 °C |
| Drill-stem test at 2 291,8 m | 80 °C |
| Gjøa gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 76 °C |
The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/9-1 same well | 0,0 | 2 350,0 | 60 °C | 1,28 | 1989 |
| 35/9-F-1 AH | 0,3 | 2 350,0 | - | - | 2009 |
| 35/9-F-1 H | 0,3 | 3 034,0 | - | - | 2009 |
| 35/9-U-2 | 0,4 | 924,0 | - | - | 2009 |
| 35/9-15 A | 1,6 | 3 250,0 | - | - | 2020 |
| 35/9-15 B | 1,6 | 3 335,0 | - | - | 2020 |
| 35/9-15 S | 1,6 | 2 520,0 | - | - | 2020 |
| 35/9-G-2 H | 2,3 | 456,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 3 | 2 100,3 - 2 138,3 | 25,4 | - | 74 | 179 | 912 000 |
| 2 | 2 225,4 - 2 249,4 | 17,6 | - | 78 | 198 | 598 000 |
| 1 | 2 285,8 - 2 291,8 | 25,4 | - | 80 | 903 | 256 452 |