Fields / Gjøa / 35/9-1
35/9-1
Exploration, wildcatSuspendedOil and gas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Gjøa, 01.04.1989 to 07.05.1989 (36 days), to 2 350,0 m in the Basement.
Water depth361,0 m
Total depth2 350,0 m MD
Vertical depth2 348,0 m TVD
Bottom-hole temperature60 °C
Max inclination5,5°
Rotary table23,0 m
Formation at total depthBasement
RigPolar Pioneer
Spud01.04.1989
Completed07.05.1989
OperatorNorsk Hydro Produksjon AS
Position61,3855 N, 3,9844 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 60 °C |
| Gjøa gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 76 °C |
The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 35/9-1 R same well | 0,0 | 2 350,0 | 82 °C | - | 1989 |
| 35/9-F-1 AH | 0,3 | 2 350,0 | - | - | 2009 |
| 35/9-F-1 H | 0,3 | 3 034,0 | - | - | 2009 |
| 35/9-U-2 | 0,4 | 924,0 | - | - | 2009 |
| 35/9-15 A | 1,6 | 3 250,0 | - | - | 2020 |
| 35/9-15 B | 1,6 | 3 335,0 | - | - | 2020 |
| 35/9-15 S | 1,6 | 2 520,0 | - | - | 2020 |
| 35/9-G-2 H | 2,3 | 456,0 | - | - | 2020 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 436,0 | 36" | 456,0 | - |
| Intermediate | 20" | 799,0 | 26" | 815,0 | 1,33 LOT |
| Intermediate | 9 5/8" | 1 917,0 | 12 1/4" | 1 942,0 | 1,79 LOT |
| Intermediate | 13 3/8" | 1 924,0 | 17 1/2" | 1 942,0 | - |
| Liner | 7" | 2 348,0 | 8 1/2" | 2 350,0 | - |
Mud weight
63 measurements, one dot each, 1,00 to 1,28 g/cm³ against measured depth, water based.