Fields / Gjøa / 35/9-2
35/9-2
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Gjøa, 01.01.1991 to 03.04.1991 (92 days), to 2 885,0 m in the Basement.
Water depth367,0 m
Total depth2 885,0 m MD
Vertical depth2 877,0 m TVD
Bottom-hole temperature100 °C
Max inclination14,0°
Rotary table25,0 m
Formation at total depthBasement
RigVildkat Explorer
Spud01.01.1991
Completed03.04.1991
OperatorNorsk Hydro Produksjon AS
Position61,3357 N, 3,9380 E
Formations
32 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 100 °C |
| Drill-stem test at 2 342,0 m | 83 °C |
| Gjøa gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 94 °C |
The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 35/9-B-2 H | 1,2 | 2 925,0 | - | - | 2010 |
| 35/9-B-3 H | 1,2 | 5 845,0 | - | - | 2010 |
| 35/9-C-2 AH | 1,2 | 5 835,0 | - | - | 2010 |
| 35/9-C-2 H | 1,2 | 4 445,0 | - | - | 2009 |
| 35/9-B-1 AH | 1,2 | 4 419,0 | - | - | 2011 |
| 35/9-B-1 BH | 1,2 | - | - | - | - |
| 35/9-B-1 H | 1,2 | 3 471,0 | - | - | 2010 |
| 35/9-C-3 Y1H | 1,2 | 4 703,0 | - | - | 2009 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 477,0 | 36" | 479,0 | - |
| Intermediate | 13 3/8" | 1 003,0 | 17 1/2" | 1 018,0 | 1,37 LOT |
| Intermediate | 9 5/8" | 1 939,0 | 12 1/4" | 1 953,0 | 1,40 LOT |
| Liner | 7" | 2 434,0 | 8 1/2" | 2 885,0 | - |
Mud weight
77 measurements, one dot each, 1,00 to 1,23 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 4 | 2 100,0 - 2 130,0 | 25,4 | - | - | 202 | 954 000 |
| 3 | 2 187,0 - 2 211,0 | 25,4 | - | - | 205 | 803 000 |
| 2 | 2 295,0 - 2 310,0 | 25,4 | - | - | 206 | 881 000 |
| 1 | 2 330,0 - 2 342,0 | 12,7 | - | 83 | 289 | 2 063 000 |